While Restoring Central Electricity Regulatory Commission (CERC) order and rejecting APTEL’s (Appellate Tribunal for Electricity) ‘beneficial use’ theory and Commercial Operation Date (COD) review, the Supreme Court has held that the two LILOs (Line-In Line-Out/Loop-In Loop-Out) at the Tuticorin Pooling Station were actively used for evacuation and transmission of power from the generating station, making them an operational part of the transmission system.
The Apex Court clarified that non-commissioning of the Tuticorin-Salem-Madhugiri transmission corridor did not render the LILOs redundant, as electricity continued to be evacuated and transmitted through the existing network arrangement. Since the generating company failed to commission its DTL to the Tuticorin Pooling Station within the agreed timeline, it was liable to bear the transmission charges for the period during which it utilized PGCIL’s transmission assets.
The Court found that APTEL erred in concluding that the LILOs were not put to beneficial use. Once the assets were commissioned and power necessarily flowed through them, their utility stood established. The Commercial Operation Dates (CODs) accepted by CERC on the basis of successful trial operation, RLDC certification and statutory approvals were valid and did not require reconsideration under the Tariff Regulations.
Also read IBC Cannot Be Used To Escape Binding BIFR Rehabilitation Scheme: Rules Supreme Court
Briefly, the dispute arose from transmission tariff claims raised by Power Grid Corporation of India Limited (PGCIL) for two Line-In Line-Out (LILO) transmission assets created on the Tuticorin JV-Madurai 400 kV transmission line at the Tuticorin Pooling Station. The LILOs were commissioned on 4 January 2015 and 8 January 2015 respectively. During the relevant period, power generated by Moxie Power Generation Limited (formerly Coastal Energen) was admittedly transmitted through the grid and supplied by Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) to consumers. However, the generating company and TANGEDCO contended that the LILO assets were not actually used because the upstream transmission system connecting Tuticorin to Salem and Madhugiri had not yet been commissioned. They therefore opposed payment of transmission charges for those assets.
PGCIL claimed that the generating company had failed to commission its Dedicated Transmission Line (DTL) to the Tuticorin Pooling Station within time and was instead using PGCIL’s transmission infrastructure. The Central Electricity Regulatory Commission (CERC) accepted PGCIL’s claim and imposed transmission charges on the generating company till commissioning of the DTL. However, the Appellate Tribunal for Electricity (APTEL) reversed that finding, holding that the LILO assets had not been put to beneficial use and questioning their Commercial Operation Date (COD).
A Two-Judge Bench comprising Justice J.B. Pardiwala and Justice K. Vinod Chandran observed that there was no dispute that electricity was continuously generated, transmitted, supplied and consumed during the relevant period. The only issue was whether the LILOs at the Tuticorin Pooling Station were actually used in the evacuation of power.
The Court found that once the LILOs were commissioned, power flowing through the Tuticorin JV-Madurai line necessarily had to pass through the Tuticorin Pooling Station and then return to the transmission line. Therefore, the contention that the LILOs were never used was factually incorrect.
The Court rejected the argument that electricity simply followed the ‘path of least resistance’ and bypassed the LILOs. Referring to the transmission scheme and network configuration, the Court held that the LILOs physically intercepted the transmission line and routed power through the pooling station. Consequently, beneficial and actual use of the LILO assets stood clearly established.
The Court further noted that the LILOs were not temporary arrangements but permanent components of the approved transmission scheme. Their construction had been specifically approved in Standing Committee meetings and incorporated into the Bulk Power Transmission Agreement (BPTA) binding on all stakeholders. The generating company itself had earlier admitted before regulatory authorities that power evacuation was taking place using the subject transmission assets.
The Supreme Court also held that delay in commissioning the upstream Tuticorin-Salem-Madhugiri transmission corridor did not affect the functioning of the LILOs. The evacuation of generated power continued uninterrupted through the existing system. Therefore, absence of the upstream corridor could not be a ground to deny transmission charges for the LILO assets that were already operational and being used.
On the issue of Commercial Operation Date (COD), the Court found that CERC had correctly accepted the CODs based on successful trial operation, RLDC certification and other statutory approvals. Since the assets had entered regular service and were being used, there was no requirement for a fresh COD determination under Regulation 4(3)(ii) of the Tariff Regulations. The Court held that APTEL had wrongly interfered with the COD already approved by CERC.
Appearances
For Appellants: Mr. Ramji Srinivasan, Sr. Adv., Ms. Swapna Seshadri, Adv., Mr. Pramod Dayal, AOR, Mr. Nikunj Dayal, Adv., Ms. Rupinder Kaur, Adv., Ms. Namrata Saraogi, Adv., Ms. Shefali Munde, Adv., Mr. Aryansh Tripathi, Adv., Ms. Radhika Gaur, Adv., Ms. Kaushiki, Adv.
For Respondents: Mr. Sajan Poovayya, Sr. Adv., Mr. Mahesh Agarwal, Adv., Mr. Matrugupta Mishra, Adv., Mr. Arshit Anand, Adv., Ms. Vidisha Swarup, Adv., Ms. Siddhi Gupta, Adv., Ms. Vanshika Saraf, Adv., Mr. Nipun Dave, Adv., Mr. E. C. Agrawala, AOR
Ms. Vrinda Bhandari, AOR, S. Vallinayagam, Adv., Bhavya Arora, Adv., Durga Vallinayagam, Adv.